Best Home Renovation Award (Without Addition)

Download Homeowner Waiver Form Renovation Awards No additional square footage added Primary Award Fee $275 Primary Award Entry Deadline Saturday, Feb 7th, 2026 by 12:00 pm Partner Award Fee $150 Partner Award Entry Deadline Deadline TBD [cicba_award_enter award_id="2234" type="primary"] Awards Submission Requirements Entry FormHomeowner Waiver formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearCorporate LogoCost of Construction/Build-OutFloor Plan DrawingsNew Floor PlansAs-Built Floor PlansPhotography:6-10 Interior Images1-2 Exterior Images, 3-4 Exterior Images for New BuildRenovation and Tenant Improvement only: up to 6 before renovation imagesFeature Sheet/Specification DocumentProject Synopsis as outlined in the CriteriaEntry Fee**Please refer to Award Submission Criteria for detailed requirements. Awards Submission Criteria Eligibility Information Requirements (not seen by judges):Entry FormClient’s property release formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearMust be a legal secondary suiteCorporate Logo – full color logo in .eps format, must be true vector file, not convertedCost of Build (Must be provided in spreadsheet format with the following items broken out separately):Cost of Construction to INCLUDE:Cost of constructionAppliancesPermanent fixturesCost of Construction to EXCLUDE:Demolition and removal costsLand and GSTLandscaping costsAll interior furnishings including window coveringsOffsite LevyServices upgrade/new (example: Sewage, water)Submission Requirements (seen by judges):Floor Plan DrawingsDrawing Submission Criteria:Format: Black line floor plans on any size sheet, provided the file does not exceed 4MBDrawings:Proposed Drawings must be providedProposed Drawings must include the square footageAs-Built Drawings must be provided of each floor of the projectDrawings can of any scale, provided text is legible (See sample)Rooms must be clearly labeledRooms must include overall sizesGraphic and Presentation Standards: Drawings must abide by graphic and presentation standardsIdentifying Information:Information identifying designer, firm, builder, client and/or address must be removed/omitted No identifying logosProject name is acceptable to be shown on drawings7. Photography Submission Criteria:Number of Images: Submit up to 10 interior professional photos of the following spaces:Interior EntranceKitchenDining AreaMain Living AreaBedroomMain BathOptional Images (up to 5)Photo Titles: Label each photo with a corresponding title.Submission of Photos: All photos must be submitted at the time of entry.Renderings: Only actual photographs of the spaces are allowed. Renderings are not permitted.Identification: Photos can not include any visual identification of the builder, designers, etc.Resolution and Size: Photos must be high-resolution (300 dpi) color photos, with a maximum file size of 4MB, and approximately 8″ x 10″ in dimensions (mandatory).Judging: Submissions will be judged based on the submitted photos.Finalist Opportunities: Finalists whose project completions were close to the submission deadline will be given an opportunity to provide professional photos before the CUBE Awards Gala. These photos will be used for CICBA marketing and featured during the gala and ceremonyFeature Sheet/Specification Documents (mandatory)Project Synopsis – up to 200 words describing the total scope of the project including square footages (mandatory)Describe any unique architectural features (optional)List any other aspects of the project that would be beneficial for the judges to know (optional)Entry Fee Awards Additional Information Categories – Secondary Suite:TO BE DETERMINED BY THE COMMITTEE BASED ON ENTRIESRR1 – Best Home RenovationNo additional square footage was addedRR2 – Best Home RenovationAdditional square footage was addedRR3 – Best Kitchen RenovationRR4 – Best Bathroom/Ensuite RenovationRR5 – Best Basement RenovationQualified Entries:For renovations, tenant improvements, basement developments, and additions, qualified entries may be located anywhere within the City of Calgary.For new builds residential or commercial, eligibility will follow the City of Calgary Developed / Developing Areas map. All new-build submissions must be located within the white (developed) area of the map to qualify.

Best Home Renovation Award (With Addition)

Download Homeowner Waiver Form Renovation Awards Additional square footage added Primary Award Fee $275 Primary Award Entry Deadline Saturday, Feb 7th, 2026 by 12:00 pm Partner Award Fee $150 Partner Award Entry Deadline Deadline TBD [cicba_award_enter award_id="2228" type="primary"] Awards Submission Requirements Entry FormHomeowner Waiver formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearCorporate LogoCost of Construction/Build-OutFloor Plan DrawingsNew Floor PlansAs-Built Floor PlansPhotography:6-10 Interior Images1-2 Exterior Images, 3-4 Exterior Images for New BuildRenovation and Tenant Improvement only: up to 6 before renovation imagesFeature Sheet/Specification DocumentProject Synopsis as outlined in the CriteriaEntry Fee**Please refer to Award Submission Criteria for detailed requirements. Awards Submission Criteria Eligibility Information Requirements (not seen by judges):Entry FormClient’s property release formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearMust be a legal secondary suiteCorporate Logo – full color logo in .eps format, must be true vector file, not convertedCost of Build (Must be provided in spreadsheet format with the following items broken out separately):Cost of Construction to INCLUDE:Cost of constructionAppliancesPermanent fixturesCost of Construction to EXCLUDE:Demolition and removal costsLand and GSTLandscaping costsAll interior furnishings including window coveringsOffsite LevyServices upgrade/new (example: Sewage, water)Submission Requirements (seen by judges):Floor Plan DrawingsDrawing Submission Criteria:Format: Black line floor plans on any size sheet, provided the file does not exceed 4MBDrawings:Proposed Drawings must be providedProposed Drawings must include the square footageAs-Built Drawings must be provided of each floor of the projectDrawings can of any scale, provided text is legible (See sample)Rooms must be clearly labeledRooms must include overall sizesGraphic and Presentation Standards: Drawings must abide by graphic and presentation standardsIdentifying Information:Information identifying designer, firm, builder, client and/or address must be removed/omitted No identifying logosProject name is acceptable to be shown on drawings7. Photography Submission Criteria:Number of Images: Submit up to 10 interior professional photos of the following spaces:Interior EntranceKitchenDining AreaMain Living AreaBedroomMain BathOptional Images (up to 5)Photo Titles: Label each photo with a corresponding title.Submission of Photos: All photos must be submitted at the time of entry.Renderings: Only actual photographs of the spaces are allowed. Renderings are not permitted.Identification: Photos can not include any visual identification of the builder, designers, etc.Resolution and Size: Photos must be high-resolution (300 dpi) color photos, with a maximum file size of 4MB, and approximately 8″ x 10″ in dimensions (mandatory).Judging: Submissions will be judged based on the submitted photos.Finalist Opportunities: Finalists whose project completions were close to the submission deadline will be given an opportunity to provide professional photos before the CUBE Awards Gala. These photos will be used for CICBA marketing and featured during the gala and ceremonyFeature Sheet/Specification Documents (mandatory)Project Synopsis – up to 200 words describing the total scope of the project including square footages (mandatory)Describe any unique architectural features (optional)List any other aspects of the project that would be beneficial for the judges to know (optional)Entry Fee Awards Additional Information Categories – Secondary Suite:TO BE DETERMINED BY THE COMMITTEE BASED ON ENTRIESRR1 – Best Home RenovationNo additional square footage was addedRR2 – Best Home RenovationAdditional square footage was addedRR3 – Best Kitchen RenovationRR4 – Best Bathroom/Ensuite RenovationRR5 – Best Basement RenovationQualified Entries:For renovations, tenant improvements, basement developments, and additions, qualified entries may be located anywhere within the City of Calgary.For new builds residential or commercial, eligibility will follow the City of Calgary Developed / Developing Areas map. All new-build submissions must be located within the white (developed) area of the map to qualify.

Best Kitchen Renovation Award

Download Homeowner Waiver Form Renovation Awards Primary Award Fee $275 Primary Award Entry Deadline Saturday, Feb 7th, 2026 by 12:00 pm Partner Award Fee $150 Partner Award Entry Deadline Deadline TBD [cicba_award_enter award_id="2222" type="primary"] Awards Submission Requirements Entry FormHomeowner Waiver formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearCorporate LogoCost of Construction/Build-OutFloor Plan DrawingsNew Floor PlansAs-Built Floor PlansPhotography:6-10 Interior Images1-2 Exterior Images, 3-4 Exterior Images for New BuildRenovation and Tenant Improvement only: up to 6 before renovation imagesFeature Sheet/Specification DocumentProject Synopsis as outlined in the CriteriaEntry Fee**Please refer to Award Submission Criteria for detailed requirements. Awards Submission Criteria Eligibility Information Requirements (not seen by judges):Entry FormClient’s property release formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearMust be a legal secondary suiteCorporate Logo – full color logo in .eps format, must be true vector file, not convertedCost of Build (Must be provided in spreadsheet format with the following items broken out separately):Cost of Construction to INCLUDE:Cost of appliancesCost of permanent fixturesCost of Construction to EXCLUDE:Demolition and removal costsLand and GSTAll interior furnishings including window coveringsSubmission Requirements (seen by judges):Floor Plan DrawingsDrawing Submission Criteria:Format: Black line floor plans on any size sheet, provided the file does not exceed 4MBDrawings:Proposed Drawings must be providedProposed Drawings must include the square footageAs-Built Drawings must be provided of each floor of the projectDrawings can of any scale, provided text is legible (See sample)Rooms must be clearly labeledRooms must include overall sizesGraphic and Presentation Standards: Drawings must abide by graphic and presentation standardsIdentifying Information:Information identifying designer, firm, builder, client and/or address must be removed/omitted No identifying logosProject name is acceptable to be shown on drawings7. Photography Submission Criteria:Number of Images: Submit up to 10 interior professional photos of the following spaces:Living AreaBedroomBathroomBar (if applicable)Optional Images (up to 5)Up to 6 before renovation imagesPhoto Titles: Label each photo with a corresponding title.Submission of Photos: All photos must be submitted at the time of entry.Renderings: Only actual photographs of the spaces are allowed. Renderings are not permitted.Identification: Photos can not include any visual identification of the builder, designers, etc.Resolution and Size: Photos must be high-resolution (300 dpi) color photos, with a maximum file size of 4MB, and approximately 8″ x 10″ in dimensions (mandatory).Judging: Submissions will be judged based on the submitted photos.Finalist Opportunities: Finalists whose project completions were close to the submission deadline will be given an opportunity to provide professional photos before the CUBE Awards Gala. These photos will be used for CICBA marketing and featured during the gala and ceremonyFeature Sheet/Specification Documents (mandatory)Project Synopsis – up to 200 words describing the total scope of the project including square footages (mandatory)Describe any unique architectural features (optional)List any other aspects of the project that would be beneficial for the judges to know (optional)Entry Fee Awards Additional Information Categories – Secondary Suite:TO BE DETERMINED BY THE COMMITTEE BASED ON ENTRIESRR1 – Best Home RenovationNo additional square footage was addedRR2 – Best Home RenovationAdditional square footage was addedRR3 – Best Kitchen RenovationRR4 – Best Bathroom/Ensuite RenovationRR5 – Best Basement RenovationQualified Entries:For renovations, tenant improvements, basement developments, and additions, qualified entries may be located anywhere within the City of Calgary.For new builds residential or commercial, eligibility will follow the City of Calgary Developed / Developing Areas map. All new-build submissions must be located within the white (developed) area of the map to qualify.

Best Ensuite or Bath Renovation Award

Download Homeowner Waiver Form Renovation Awards Primary Award Fee $275 Primary Award Entry Deadline Saturday, Feb 7th, 2026 by 12:00 pm Partner Award Fee $150 Partner Award Entry Deadline Deadline TBD [cicba_award_enter award_id="2215" type="primary"] Awards Submission Requirements Entry FormHomeowner Waiver formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearCorporate LogoCost of Construction/Build-OutFloor Plan DrawingsNew Floor PlansAs-Built Floor PlansPhotography:6-10 Interior Images1-2 Exterior Images, 3-4 Exterior Images for New BuildRenovation and Tenant Improvement only: up to 6 before renovation imagesFeature Sheet/Specification DocumentProject Synopsis as outlined in the CriteriaEntry Fee**Please refer to Award Submission Criteria for detailed requirements. Awards Submission Criteria Eligibility Information Requirements (not seen by judges):Entry FormClient’s property release formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearMust be a legal secondary suiteCorporate Logo – full color logo in .eps format, must be true vector file, not convertedCost of Build (Must be provided in spreadsheet format with the following items broken out separately):Cost of Construction to INCLUDE:Cost of appliancesCost of permanent fixturesCost of Construction to EXCLUDE:Demolition and removal costsLand and GSTAll interior furnishings including window coveringsSubmission Requirements (seen by judges):Floor Plan DrawingsDrawing Submission Criteria:Format: Black line floor plans on any size sheet, provided the file does not exceed 4MBDrawings:Proposed Drawings must be providedProposed Drawings must include the square footageAs-Built Drawings must be provided of each floor of the projectDrawings can of any scale, provided text is legible (See sample)Rooms must be clearly labeledRooms must include overall sizesGraphic and Presentation Standards: Drawings must abide by graphic and presentation standardsIdentifying Information:Information identifying designer, firm, builder, client and/or address must be removed/omitted No identifying logosProject name is acceptable to be shown on drawings7. Photography Submission Criteria:Number of Images: Submit up to 10 interior professional photos of the following spaces:Living AreaBedroomBathroomBar (if applicable)Optional Images (up to 5)Up to 6 before renovation imagesPhoto Titles: Label each photo with a corresponding title.Submission of Photos: All photos must be submitted at the time of entry.Renderings: Only actual photographs of the spaces are allowed. Renderings are not permitted.Identification: Photos can not include any visual identification of the builder, designers, etc.Resolution and Size: Photos must be high-resolution (300 dpi) color photos, with a maximum file size of 4MB, and approximately 8″ x 10″ in dimensions (mandatory).Judging: Submissions will be judged based on the submitted photos.Finalist Opportunities: Finalists whose project completions were close to the submission deadline will be given an opportunity to provide professional photos before the CUBE Awards Gala. These photos will be used for CICBA marketing and featured during the gala and ceremonyFeature Sheet/Specification Documents (mandatory)Project Synopsis – up to 200 words describing the total scope of the project including square footages (mandatory)Describe any unique architectural features (optional)List any other aspects of the project that would be beneficial for the judges to know (optional)Entry Fee Awards Additional Information Categories – Secondary Suite:TO BE DETERMINED BY THE COMMITTEE BASED ON ENTRIESRR1 – Best Home RenovationNo additional square footage was addedRR2 – Best Home RenovationAdditional square footage was addedRR3 – Best Kitchen RenovationRR4 – Best Bathroom/Ensuite RenovationRR5 – Best Basement RenovationQualified Entries:For renovations, tenant improvements, basement developments, and additions, qualified entries may be located anywhere within the City of Calgary.For new builds residential or commercial, eligibility will follow the City of Calgary Developed / Developing Areas map. All new-build submissions must be located within the white (developed) area of the map to qualify.

Best Basement Renovation Award

Download Homeowner Waiver Form Renovation Awards Primary Award Fee $275 Primary Award Entry Deadline Saturday, Feb 7th, 2026 by 12:00 pm Partner Award Fee $150 Partner Award Entry Deadline Deadline TBD [cicba_award_enter award_id="2209" type="primary"] Awards Submission Requirements Entry FormHomeowner Waiver formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearCorporate LogoCost of Construction/Build-OutFloor Plan DrawingsNew Floor PlansAs-Built Floor PlansPhotography:6-10 Interior Images1-2 Exterior Images, 3-4 Exterior Images for New BuildRenovation and Tenant Improvement only: up to 6 before renovation imagesFeature Sheet/Specification DocumentProject Synopsis as outlined in the CriteriaEntry Fee**Please refer to Award Submission Criteria for detailed requirements. Awards Submission Criteria Eligibility Information Requirements (not seen by judges):Entry FormClient’s property release formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearMust be a legal secondary suiteCorporate Logo – full color logo in .eps format, must be true vector file, not convertedCost of Build (Must be provided in spreadsheet format with the following items broken out separately):Cost of Construction to INCLUDE:Cost of appliancesCost of permanent fixturesCost of Construction to EXCLUDE:Demolition and removal costsLand and GSTAll interior furnishings including window coveringsSubmission Requirements (seen by judges):Floor Plan DrawingsDrawing Submission Criteria:Format: Black line floor plans on any size sheet, provided the file does not exceed 4MBDrawings:Proposed Drawings must be providedProposed Drawings must include the square footageAs-Built Drawings must be provided of each floor of the projectDrawings can of any scale, provided text is legible (See sample)Rooms must be clearly labeledRooms must include overall sizesGraphic and Presentation Standards: Drawings must abide by graphic and presentation standardsIdentifying Information:Information identifying designer, firm, builder, client and/or address must be removed/omitted No identifying logosProject name is acceptable to be shown on drawings7. Photography Submission Criteria:Number of Images: Submit up to 10 interior professional photos of the following spaces:Living AreaBedroomBathroomBar (if applicable)Optional Images (up to 5)Up to 6 before renovation imagesPhoto Titles: Label each photo with a corresponding title.Submission of Photos: All photos must be submitted at the time of entry.Renderings: Only actual photographs of the spaces are allowed. Renderings are not permitted.Identification: Photos can not include any visual identification of the builder, designers, etc.Resolution and Size: Photos must be high-resolution (300 dpi) color photos, with a maximum file size of 4MB, and approximately 8″ x 10″ in dimensions (mandatory).Judging: Submissions will be judged based on the submitted photos.Finalist Opportunities: Finalists whose project completions were close to the submission deadline will be given an opportunity to provide professional photos before the CUBE Awards Gala. These photos will be used for CICBA marketing and featured during the gala and ceremonyFeature Sheet/Specification Documents (mandatory)Project Synopsis – up to 200 words describing the total scope of the project including square footages (mandatory)Describe any unique architectural features (optional)List any other aspects of the project that would be beneficial for the judges to know (optional)Entry Fee Awards Additional Information Categories – Secondary Suite:TO BE DETERMINED BY THE COMMITTEE BASED ON ENTRIESRR1 – Best Home RenovationNo additional square footage was addedRR2 – Best Home RenovationAdditional square footage was addedRR3 – Best Kitchen RenovationRR4 – Best Bathroom/Ensuite RenovationRR5 – Best Basement RenovationQualified Entries:For renovations, tenant improvements, basement developments, and additions, qualified entries may be located anywhere within the City of Calgary.For new builds residential or commercial, eligibility will follow the City of Calgary Developed / Developing Areas map. All new-build submissions must be located within the white (developed) area of the map to qualify.

New Secondary Suite Award

Download Homeowner Waiver Form Renovation Awards A new secondary suite as part of a renovation Primary Award Fee $275 Primary Award Entry Deadline Saturday, Feb 7th, 2026 by 12:00 pm Partner Award Fee $150 Partner Award Entry Deadline Deadline TBD [cicba_award_enter award_id="2165" type="primary"] Awards Submission Requirements Entry FormHomeowner Waiver formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearCorporate LogoCost of Construction/Build-OutFloor Plan DrawingsNew Floor PlansAs-Built Floor PlansPhotography:6-10 Interior Images1-2 Exterior Images, 3-4 Exterior Images for New BuildRenovation and Tenant Improvement only: up to 6 before renovation imagesFeature Sheet/Specification DocumentProject Synopsis as outlined in the CriteriaEntry Fee**Please refer to Award Submission Criteria for detailed requirements. Awards Submission Criteria Eligibility Information Requirements (not seen by judges):Entry FormClient’s property release formVista Report – proof of permit completion/occupancy – must be between December 1st of previous year and November 30th of the current yearMust be a legal secondary suiteCorporate Logo – full color logo in .eps format, must be true vector file, not convertedCost of Build (Must be provided in spreadsheet format with the following items broken out separately):Cost of Construction to INCLUDE:Cost of appliancesCost of permanent fixturesCost of mechanical for Secondary Suite OnlyCost of Construction to EXCLUDE:Any construction not pertaining to the Secondary SuiteDemolition and removal costsDevelopment Permit FeesLand and GSTServices upgrade/new (example: Sewage, water)All interior furnishings including window coveringsSubmission Requirements (seen by judges):Floor Plan DrawingsDrawing Submission Criteria:Format: Black line floor plans on any size sheet, provided the file does not exceed 4MBDrawings:Proposed Drawings must be providedProposed Drawings must include the square footageAs-Built Drawings must be provided of each floor of the projectDrawings can of any scale, provided text is legible (See sample)Rooms must be clearly labeledRooms must include overall sizesGraphic and Presentation Standards: Drawings must abide by graphic and presentation standardsIdentifying Information:Information identifying designer, firm, builder, client and/or address must be removed/omitted No identifying logosProject name is acceptable to be shown on drawings7. Photography Submission Criteria:Number of Images: Submit up to 10 interior professional photos of the following spaces:Interior EntranceKitchenGreat RoomBedroomBathroomOptional Images (up to 4)Photo Titles: Label each photo with a corresponding title.Submission of Photos: All photos must be submitted at the time of entry.Renderings: Only actual photographs of the spaces are allowed. Renderings are not permitted.Identification: Photos can not include any visual identification of the builder, designers, etc.Resolution and Size: Photos must be high-resolution (300 dpi) color photos, with a maximum file size of 4MB, and approximately 8″ x 10″ in dimensions (mandatory).Judging: Submissions will be judged based on the submitted photos.Finalist Opportunities: Finalists whose project completions were close to the submission deadline will be given an opportunity to provide professional photos before the CUBE Awards Gala. These photos will be used for CICBA marketing and featured during the gala and ceremonyFeature Sheet/Specification Documents (mandatory)Project Synopsis – up to 200 words describing the total scope of the project including square footages (mandatory)Describe any unique architectural features (optional)List any other aspects of the project that would be beneficial for the judges to know (optional)Entry Fee Awards Additional Information Categories – Secondary Suite:TO BE DETERMINED BY THE COMMITTEE BASED ON ENTRIESSS1 – Best New Secondary Suite within New BuildSS2 – Best New Secondary Suite within Existing BuildingQualified Entries:For renovations, tenant improvements, basement developments, and additions, qualified entries may be located anywhere within the City of Calgary.For new builds residential or commercial, eligibility will follow the City of Calgary Developed / Developing Areas map. All new-build submissions must be located within the white (developed) area of the map to qualify.